:: Class Utilisation Summary 2010
See LEGEND for key to shading and symbols.
:: Subject Area - PTRL Term - Semester 1
Data is correct as at Mon Oct 11 02:00:30 EST 2010
Comp | Sect | Class | Type | Status | Enr/Cap | % Full | Times (weeks, Location) - default 1hour |
PTRL1010 | Intro. to Petroleum Industry | ||||||
LEC | A | 4392 | Enr | Open | 38/80 | 48% | Mon 12-14 (w1-5,6-12, ChemScM17); Wed 15-17 (w1-5,6-12, ChemScM17) Comb/w PTRL5015-PGRD |
PTRL2010 | Business Practices - Pet Eng | ||||||
LEC | A | 4393 | Enr | Open | 21/45 | 47% | Wed 08-10 (w1-5,6-12, ASBus 220); Thu 08-10 (w1-5,6-12, ASBus 220) |
PTRL3001 | Reservoir Engineering B | ||||||
LE1 | A | 4394 | Enr | Open | 22/40 | 55% | Tue 10-12 (w1-5,6-12, Webst 251); Thu 10-12 (w1-5,6-12, Webst 250) |
TU1 | T14A | 4395 | Rel | Open | 22/40 | 55% | Tue 14 (w1-5,6-12, Webst 250); Thu 13 (w1-5,6-12, Law 162) |
PTRL3003 | Field Develop Geol &Geophysics | ||||||
LE2 | 001 | 4400 | Auto | Open | 21/40 | 53% | Mon 09-11 (w1-5,6-12, Webst 251) |
LEC | A | 4396 | Enr | Open | 21/40 | 53% | Tue 15-17 (w1-5,6-12, ChemSc M11) Comb/w PTRL5006-PGRD |
TU2 | W09A | 4397 | Rel | Open | 21/40 | 53% | Wed 09 (w1-5,6-12, Law 162) |
TUT | T09A | 4398 | Rel | Open | 21/23 [40] | 91% | Tue 09 (w1-5,6-12, Law 203) Comb/w PTRL5006-PGRD |
TUT | T17A | 4399 | Rel | Canc | 0/40 | 0% | Tue 17 (w1-5,6-12, Law 388) Comb/w PTRL5006-PGRD |
PTRL3015 | Well Drilling Equip&Operations | ||||||
LAB | 501 | 4401 | Rel | Open | 6/20 | 30% | Thu 14-17 (w1-5,6-12, PetEng G06) |
LAB | 502 | 4402 | Rel | Open | 10/20 | 50% | Mon 14-17 (w1-5,6-12, PetEng G06) |
LEC | 001 | 4403 | Enr | Open | 16/34 [40] | 47% | Wed 11-14 (w1-5,6-12, Law Th G02) Comb/w PTRL5009-PGRD |
PTRL4010 | Oil&Gas Field Eval. Thesis "A" | ||||||
TUT | 1A | 4404 | Enr | Open | 39/50 | 78% | Mon 14-18 (w1-5,6-12, ASBus 220) |
PTRL4012 | Enhanced Oil & Gas Recovery | ||||||
LEC | A | 4901 | Enr | Open | 40/50 | 80% | Tue 14-16 (w1-5,6-12, Mat 310) Comb/w PTRL5012-PGRD |
TUT | H12A | 4902 | Rel | Open | 37/41 [50] | 90% | Thu 12-14 (w1-5,6-12, ChemSc M14) Comb/w PTRL5012-PGRD |
TUT | H16A | 4903 | Rel | Open | 3/49 [50] | 6% | Thu 16-18 (w1-5,6-12, ChemSc M14) Comb/w PTRL5012-PGRD |
PTRL4020 | Natural Gas Engineering | ||||||
LEC | A | 4405 | Enr | Open | 38/50 | 76% | Wed 11-13 (w1-5,6-12, ChemSc M11) Comb/w PTRL5010-PGRD |
TUT | W13A | 4406 | Rel | Open | 38/59 [65] | 64% | Wed 13-15 (w1-5,6-12, ChemSc M11) Comb/w PTRL5010-PGRD |
PTRL4024 | Drilling Fluids & Cementing | ||||||
LEC | A | 8178 | Enr | Full | 53/35 | > 100% | Mon 11-13 (w1-5,6-12, ASBus 205); Wed 15-17 (w1-5,6-12, ASBus 130) |
PTRL5006 | Field Dev Geol - Pet Eng | ||||||
LEC | A | 4407 | Enr | Open* | 17/25 | 68% | Tue 15-17 (w1-5,6-12, ChemSc M11) Comb/w PTRL3003-UGRD |
TUT | T09A | 4408 | Rel | Open* | 17/19 [25] | 89% | Tue 09 (w1-5,6-12, Law 203) Comb/w PTRL3003-UGRD |
TUT | T17A | 4409 | Rel | Canc* | 0/25 | 0% | Tue 17 (w1-5,6-12, Law 388) Comb/w PTRL3003-UGRD |
PTRL5007 | Reservoir Engineering | ||||||
LEC | A | 4410 | Enr | Open | 22/25 | 88% | Mon 09-12 (w1-5,6-12, ASBus 219) |
PTRL5009 | Well Drilling Equip&Operations | ||||||
LEC | A | 4411 | Enr | Full* | 31/25 | > 100% | Wed 11-14 (w1-5,6-12, Law Th G02) Comb/w PTRL3015-UGRD |
PTRL5010 | Natural Gas Engineering | ||||||
LEC | A | 4412 | Enr | Open* | 6/15 | 40% | Wed 11-13 (w1-5,6-12, ChemSc M11) Comb/w PTRL4020-UGRD |
TUT | W13A | 4413 | Rel | Open* | 6/15 | 40% | Wed 13-15 (w1-5,6-12, ChemSc M11) Comb/w PTRL4020-UGRD |
PTRL5012 | Enhanced Oil & Gas Recovery | ||||||
LEC | A | 4414 | Enr | Full | 10/10 | 100% | Tue 14-16 (w1-5,6-12, Mat 310) Comb/w PTRL4012-UGRD |
TUT | H12A | 4415 | Rel | Open | 9/10 | 90% | Thu 12-14 (w1-5,6-12, ChemSc M14) Comb/w PTRL4012-UGRD |
TUT | H16A | 4416 | Rel | Open | 1/10 | 10% | Thu 16-18 (w1-5,6-12, ChemSc M14) Comb/w PTRL4012-UGRD |
PTRL5015 | Overview - Petroleum Industry | ||||||
LEC | A | 5916 | Enr | Open | 1/25 | 4% | Mon 12-14 (w1-5,6-12, ChemScM17); Wed 15-17 (w1-5,6-12, ChemScM17) Comb/w PTRL1010-UGRD |
PTRL6001 | Reservoir Engineering 1 | ||||||
DST | 01 | 10242 | Enr | Open | 9/30 | 30% | |
PTRL6003 | Well Pressure Testing | ||||||
DST | 01 | 10243 | Enr | Open | 9/30 | 30% | |
PTRL6007 | Reservoir Engineering II | ||||||
DST | 01 | 10245 | Enr | Open | 4/30 | 13% | |
PTRL6008 | Petroleum Production Economics | ||||||
DST | 01 | 10246 | Enr | Open | 12/30 | 40% | |
PTRL6009 | Well Drilling Equip&Operations | ||||||
DST | 01 | 10247 | Enr | Open | 19/30 | 63% | |
PTRL6012 | Drilling Mud | ||||||
DST | 01 | 10248 | Enr | Open | 14/30 | 47% | |
PTRL6027 | Casing Design & Cementing | ||||||
DST | 01 | 10249 | Enr | Open | 9/30 | 30% | |
PTRL6100 | F/T Res Thesis Petroleum Eng S | ||||||
THE | 0001 | 9546 | Enr | Open | 18/25 | 72% | |
PTRL6101 | P/T Res Thesis Petrol Eng Stud | ||||||
THE | 0001 | 9547 | Enr | Open | 2/5 | 40% | |
PTRL6107 | Formation Evaluation | ||||||
DST | 01 | 10250 | Enr | Open | 16/30 | 53% | |
^ top ^ | |||||||
LEGEND | |||||||
* This class requires consent. Students cannot self-enrol. | |||||||
# Timetable clash allowed. | |||||||
/odd Runs in odd weeks only. /even Runs in even weeks only. | |||||||
Comb/w Jointly taught with corresponding class(es) for specified course(s). Capacity shown is effective capacity. | |||||||
Effective capacity is the class capacity less any places taken by students in the other jointly-taught classes. | |||||||
[ ] Class capacity where different from effective capacity. | |||||||
Shaded cells: | LEC | Activity different from previous | |||||
Stop | Status is Stop Further Enrolment, Tentative, Closed or Cancelled | ||||||
100% | Class is full (> 100% means capacity is exceeded) | ||||||
80% | Class is nearly full (80% or more) | ||||||
50% | Class is half full | ||||||
0% | Class is less than half full | ||||||
UNSW Sydney NSW 2052, Australian Telephone: (within Aust) 02 9385 1000, (International) +61 2 9385 1000 CRICOS Provider Code 00098G Authorised by Deputy Vice Chancellor (Academic) & Registrar Privacy Statement Copyright & Disclaimer |