University of New South Wales
myUNSW

:: Class Utilisation Summary 2012


Subject Area Index

See LEGEND for key to shading and symbols.


:: Subject Area - PTRL  Term - Semester 2

PTRL1010 PTRL2018 PTRL2019 PTRL3002 PTRL3022 PTRL3023 (T2B)
PTRL3025 PTRL4011 PTRL4017 PTRL4021 PTRL5003 (T2B) PTRL5004
PTRL5005 PTRL5008 PTRL5011 PTRL5013 PTRL5015 PTRL5016
PTRL5021 PTRL5022 PTRL5107 (T2B) PTRL6001 PTRL6004 PTRL6006
PTRL6007 PTRL6008 PTRL6016 PTRL6021 PTRL6028 PTRL6029
PTRL6100 PTRL6101

Data is correct as at Wed Sep 26 19:11:12 EST 2012


Comp Sect Class Type Status Enr/Cap % Full Times (weeks, Location) - default 1hour 
PTRL1010   Intro. to Petroleum Industry
LECLEC1 4361EnrFull42/36 [40] > 100%   Mon 16-18 (w1-7,8-12, TETB LG07); Fri 13-15 (w1-7,8-12, TETB LG07) Comb/w PTRL5015-PGRD
PTRL2018   Introduction to Petrophysics
LAB501 6999RelFull46/35 > 100%   Thu 09-12 (w2-7,8-13, TETB LG29)
LAB502 7000RelFull44/35 > 100%   Wed 09-12 (w2-7,8-13, TETB LG29)
LEC001 7001EnrFull90/70 > 100%   Tue 12-14 (w1-3, RC Theatre); Tue 12-14 (w4-7,8-12, RC Theatre); Thu 15-18 (w1-3, Biomed ThC); Thu 15-18 (w4-7,8-12, Biomed ThC)
PTRL2019   Reservoir Engineering A
LECA 7002EnrFull111/70 > 100%   Tue 15-17 (w1-7,8-12, Biomed ThB); Thu 12-14 (w1-7,8-12, CLB 5)
PTRL3002   ResCharacterisation&Simulation
LE1001 4362EnrOpen46/55 84%   Thu 12-15 (w1-7,8-12, TETB LG05) Comb/w PTRL5021-PGRD
LE2002 4363RelOpen46/55 84%   Tue 15-18 (w1-7,8-12, TETB LG07) Comb/w PTRL5004-PGRD
PTRL3022   Pet Eng Design Project
LEC001 5175EnrFull62/60 > 100%   Mon 18:30-20:30 (w1-7,8-12, TETB LG05); Wed 18:30-20:30 (w1-7,8-12, TETB LG07) Comb/w PTRL5005-PGRD
PTRL3023   Formation Evaluation (T2B)
LE100110773EnrOpen54/60 90%   Mon 09-12 (w1-6, TETB LG07); Wed 12-15 (w1-6, TETB LG03) Comb/w PTRL5003-PGRD
LE200210774RelOpen54/60 90%   Sat 10-13 (w1-5, Law Th G23) Comb/w PTRL5107-PGRD
PTRL3025   Petroleum Economics
LECA 5473EnrOpen54/55 98%   Tue 08-10 (w1-7,8-12, TETB LG07); Wed 08-10 (w1-7,8-12, TETB LG07); Thu 08-10 (w1-7,8-12, TETB LG07) Comb/w PTRL5008-PGRD
PTRL4011   Oil/Gas Field Eval. Thesis "B"
TUTA 4364EnrFull37/35 > 100%   Mon 15-19 (w1-7,8-12, TETB G16)
PTRL4017   Well Technology
LE1A 5474RelOpen34/37 [45] 92%   Fri 09-12 (w1-7,8-12, TETB LG07) Comb/w PTRL5022-PGRD
LECB 5475EnrOpen34/39 [45] 87%   Wed 09-12 (w1-7,8-12, TETB LG03) Comb/w PTRL5016-PGRD
PTRL4021   Pet Production Engineering
LECA 5380EnrOpen37/45 82%   Thu 15-17 (w1-7,8-12, TETB LG03); Thu 17-19 (w1-7,8-12, ChemSc M11) Comb/w PTRL5011-PGRD
PTRL5003   Well Pressure Testing (T2B)
LE100110775EnrOpen5/10 50%   Mon 09-12 (w1-6, TETB LG07); Wed 12-15 (w1-6, TETB LG03) Comb/w PTRL3023-UGRD
PTRL5004   Numerical Res. Simulation
LE2001 4366EnrOpen*4/15 27%   Tue 15-18 (w1-7,8-12, TETB LG07) Comb/w PTRL3002-UGRD
PTRL5005   Design Project Pet Eng
LEC001 4367EnrOpen*1/3 [15] 33%   Mon 18:30-20:30 (w1-7,8-12, TETB LG05); Wed 18:30-20:30 (w1-7,8-12, TETB LG07) Comb/w PTRL3022-UGRD
PTRL5008   Petroleum Production Economics
LECA 4368EnrOpen2/15 13%   Tue 08-10 (w1-7,8-12, TETB LG07); Wed 08-10 (w1-7,8-12, TETB LG07); Thu 08-10 (w1-7,8-12, TETB LG07) Comb/w PTRL3025-UGRD
PTRL5011   Petro.Production Eng
LECA 4369EnrOpen*24/25 96%   Thu 15-17 (w1-7,8-12, TETB LG03); Thu 17-19 (w1-7,8-12, ChemSc M11) Comb/w PTRL4021-UGRD
PTRL5013   Petroleum Geology
LECA 8917EnrFull20/15 > 100%   Mon 12-15 (w1-7,8-12, TETB LG03)
PTRL5015   Overview - Petroleum Industry
LECLEC1 5881EnrFull19/13 [15] > 100%   Mon 16-18 (w1-7,8-12, TETB LG07); Fri 13-15 (w1-7,8-12, TETB LG07) Comb/w PTRL1010-UGRD
PTRL5016   Well Completions & Stimulation
LECA 4370EnrFull31/25 > 100%   Wed 09-12 (w1-7,8-12, TETB LG03) Comb/w PTRL4017-UGRD
PTRL5021   Reservoir Characterisation
LE1001 4371EnrOpen*6/15 40%   Thu 12-15 (w1-7,8-12, TETB LG05) Comb/w PTRL3002-UGRD
PTRL5022   Drilling Systems Design
LE1A 4372EnrFull33/25 > 100%   Fri 09-12 (w1-7,8-12, TETB LG07) Comb/w PTRL4017-UGRD
PTRL5107   Formation Evaluation (T2B)
LE200210772EnrOpen8/10 80%   Sat 10-13 (w1-5, Law Th G23) Comb/w PTRL3023-UGRD
PTRL6001   Reservoir Engineering 1
DST0110193EnrOpen12/30 40%  
PTRL6004   Numerical Res. Simulation
DST0110194EnrOpen3/30 10%  
PTRL6006   Field Development Geology
OTH0110195EnrOpen5/20 25%  
PTRL6007   Reservoir Engineering II
DST0110196EnrOpen7/30 23%  
PTRL6008   Petroleum Production Economics
DST0110197EnrOpen5/30 17%  
PTRL6016   Well Completions & Stimulation
DST0110198EnrOpen15/30 50%  
PTRL6021   Reservoir Characterisation
DST0110199EnrOpen2/30 7%  
PTRL6028   Practical Well Planning
DST0110200EnrOpen9/30 30%  
PTRL6029   Directional H. & M. Drilling
DST0110201EnrOpen13/30 43%  
PTRL6100   F/T Res Thesis Petroleum Eng S
THE0001 1201EnrOpen22/25 88%  
PTRL6101   P/T Res Thesis Petrol Eng Stud
THE0001 1202EnrOpen0/5 0%  
^ top ^
LEGEND
* This class requires consent. Students cannot self-enrol.
# Timetable clash allowed.
/odd  Runs in odd weeks only.     /even  Runs in even weeks only.
Comb/w Jointly taught with corresponding class(es) for specified course(s). Capacity shown is effective capacity.
      Effective capacity is the class capacity less any places taken by students in the other jointly-taught classes.
[  ] Class capacity where different from effective capacity.
  
Shaded cells:  LEC Activity different from previous
Stop Status is Stop Further Enrolment, Tentative, Closed or Cancelled
100%   Class is full (> 100% means capacity is exceeded)
80%   Class is nearly full (80% or more)
50%   Class is half full
0%   Class is less than half full